N. L. Olson & Associates, Inc

Engineering, Planning & Land Surveying

office (360) 876-2284
fax (360) 876-1487
toll-free (800) 755-1282

Kitsap County Youth Services Center

Summary of Project

The project was a challenge from the start.  The site area was very limited, with an existing structure on one side and 30% slopes on the other.  The  water, sewer, surface water and roadway design all had to be closely coordinated to fit into this limited area, and to complicate things, the existing detention building had to stay in continual operation without disruptions.  A traffic study was completed to address the possible impacts of a new access onto Tremont Street.  The traffic study resulted in the need to design a channelization and widening plan for the new access point. In order to take advantage of the dry summer months and keep the project on schedule, it was decided to phase the project and complete the site work in the summer.  A separate site work bid package was developed and placed out to bid.  The bids were under budget and the site work was completed without complications.  The project was funded by a bond issue approved by the voters.  The bond issue mandated the need for solid, accurate cost estimating and design.  The project came in under budget.
Harrison Medical Campus - Silverdale